General Assembly Resolutions
-
10Resolutions
-
5Adopted
-
0On-going
-
5Completed
-
-
3Rejected
-
2Withdrawn
-
GA 6-1A
Adopted (Completed)The need for all CSPO and PK/PKO to be purchased and used by RSPO non-producer members.That RSPO develop a mechanism to ensure that all certified sustainable palm oil (CSPO) and certified sustainable palm kernel oil (CSPKO) (broadly termed as CSPO) produced by producer (growers and millers) members are purchased and utilized by RSPO non-producer members i.e. palm oil... -
GA 6-1B
RejectedRequires that those members not directly involved in trade become committed to actively support and promote use of CSPO.That RSPO require RSPO members not directly involved in the trade e.g. NGOs, banks & investors to commit to actively support and promote CSPO. -
GA 6-1C
Adopted (Completed)Call for establishment of working groups to define ways to share the costs of certification of smallholdersThat RSPO commission a working group to establish a system to share the cost of certification for smallholders. -
GA 6-1D
Adopted (Completed)Call for establishment of working groups to define ways to share the costs of certification and verification of new plantings, between those directly ...That RSPO commission a working group to establish a system to share the cost of certification and verification of new plantings currently borne solely by growers. -
GA 6-2
RejectedThat RSPO establish a Protocol for Development, Review and Amendment of RSPO Standards, Guidelines and Procedures.6 components: - The first calls for the process to be prudent, fair, balanced, participatory, transparent and accountable. - the need for a time frame for review, amendment and revision of the generic standards after at least a five-year implementation period. - the review team should reflect the... -
GA 6-3
RejectedThat RSPO adopt new procedures respecting the Rotation and Duration of Presidency of RSPO.Calls for the election of the Presidency of RSPO to be done on a bi-yearly basis, the Presidency to be restricted to one term of two years and the President to be re-elected from among the EB members. -
GA 6-4
Adopted (Completed)That RSPO impose a moratorium on land clearance in the Bukit Tigapuluh Ecosystem.No additional information -
GA 6-5
Adopted (Completed)That RSPO establish a working group to provide recommendations on how to deal with existing plantations on peatlands.No additional information -
GA 6-6
WithdrawnGHG criteriaNo additional information -
GA 6-7
WithdrawnAmendments to New Planting ProceduresNo additional information
- For
- Against
- Abstain
- Spoilt